기본 정보
연구 분야
프로젝트
논문
구성원
article|
인용수 1
·2020
A Study on the External Stone Cladding System in Production and Installation Stages: The Case of Hong Kong
Chun Fai Alvin Yiu, Yoo-Jun Kim, WoonSeong Jeong, Hung-Lin Chi, Min-Koo Kim
IF 2.679Applied Sciences
초록

The successful quality management of the external stone cladding system in production and installation stages is of vital importance to ensure the high quality of the completed system. Nevertheless, little research has been conducted in this area. This research aimed to report the current status of the external stone cladding system in the production and installation stages in Hong Kong. To do so, this paper examines its current practices and major issues occurred through case studies, questionnaire surveys, and interviews. The results revealed the insufficiency in control mechanism and quality control in the system in Hong Kong. Furthermore, the factors to ensure the quality of the two stages were determined. Lastly, this research suggested recommendations on the possible measures to improve the system quality: pre-testing of stone materials and anchorage system, quality assurance of suppliers and manufacturers, regular inspections and audits on production, and continuous site quality supervision and checklist. The findings and outcomes of the research could lead to actions to guarantee steady quality for the stone cladding façade.

키워드
AuditChecklistQuality (philosophy)Quality assuranceOperations managementQuality management systemCladding (metalworking)EngineeringBusinessQuality management
타입
article
IF / 인용수
2.679 / 1
게재 연도
2020

주식회사 디써클

대표 장재우,이윤구서울특별시 강남구 역삼로 169, 명우빌딩 2층 (TIPS타운 S2)대표 전화 0507-1312-6417이메일 info@rndcircle.io사업자등록번호 458-87-03380호스팅제공자 구글 클라우드 플랫폼(GCP)

© 2026 RnDcircle. All Rights Reserved.