Prediction of Settlement Due to Shield TBM Tunneling Based on Three-Dimensional Numerical Analysis
Ji-Seok Yun, Hankyu Yoo, Sung-Pil Hwang, Wooseok Kim, Han-eol Kim
Buildings
초록

The Tunnel Boring Machine (TBM) method has gained attention as an eco-friendly tunneling technique, effectively reducing noise, vibration, and carbon emissions compared to conventional blasting methods. However, ground settlement and volume loss are inevitable during TBM excavation due to the deformation of the surrounding ground, which may even lead to ground collapse in severe cases. In this study, a Shield TBM model, validated using field data, was employed to perform numerical analyses on parameters such as tunnel diameter, ground elastic modulus, face pressure, and backfill pressure. Based on the simulation results, the influence of each parameter on settlement was evaluated, and a predictive model for estimating maximum settlement was developed. The proposed model was statistically validated using p-value assessment, variance inflation factor (VIF), coefficient of determination (R2), and residual analysis. Furthermore, the prediction model showed high agreement with the field data, yielding a prediction error of 8.25%. This study emphasizes the applicability of verified numerical modeling for accurately predicting ground settlement in Shield TBM tunneling and provides a reliable approach for settlement prediction under varying construction conditions.

키워드
ShieldQuantum tunnellingSettlement (finance)Structural engineeringGeotechnical engineeringMaterials scienceEngineeringGeologyForensic engineeringComputer science
타입
article
IF / 인용수
- / 1
게재 연도
2025

주식회사 디써클

대표 장재우,이윤구서울특별시 강남구 역삼로 169, 명우빌딩 2층 (TIPS타운 S2)대표 전화 0507-1312-6417이메일 info@rndcircle.io사업자등록번호 458-87-03380호스팅제공자 구글 클라우드 플랫폼(GCP)

© 2026 RnDcircle. All Rights Reserved.