RnDCircle Logo
arrow left icon

지능형 사업관리연구실

고려대학교 본교(제1캠퍼스) 건축사회환경공학부

조훈희 교수

Dynamic Scheduling

3D Point Cloud Processing

BIM-Based Quantity Take-Off

발행물

전체 논문

106

11

Algorithm for Generating 3D Geometric Representation Based on Indoor Point Cloud Data
MW Ryu, SM Oh, MJ Kim, HH Cho, CB Son, TH Kim
Applied Sciences, 2020

12

Development of an advanced composite system form for constructability improvement through a Design for Six Sigma process
D Lee, T Kim, D Lee, H Lim, H Cho, KI Kang
Journal of Civil Engineering and Management, 2020

13

Dynamic production scheduling model under due date uncertainty in precast concrete construction
T Kim, Y Kim, H Cho
Journal of Cleaner Production, 2020

14

Simulation-Based Lift Planning Model for the Lift Transfer Operation System
T Kim, D Lee, M Cha, H Lim, M Lee, H Cho, KI Kang
Journal of Construction Engineering and Management, 2020

15

Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA
Lee, D., Lim, H., Lee D., Cho, H., Kang, K. I.
International Journal of Concrete Structures and Materials, 2019

16

Dynamic Lifecycle Assessment in Building Construction Projects: Focusing on Embodied Emissions
G Kang, H Cho, D Lee
Sustainability, 2019

17

Stochastic Analysis of Embodied Carbon Dioxide Emissions Considering Variability of Construction Sites
D Lee, G Kang, C Nam, H Cho, KI Kang
Sustainability, 2019

18

Trends in 3D Printing Technology for Construction Automation Using Text Mining
D Lee, H Kim, J Sim, D Lee, H Cho, D Hong
International Journal of Precision Engineering and Manufacturing, 2019

19

Flexible Double-cage Hoist for High Operational Efficiency in Tall Building construction
T Kim, UK Lee, SW Kim, H Lim, CW Kim, H Cho, KI Kang
Automation in Construction, 2019

20

Simulation Model for Pro
Baik, H., Kim, M., Lee, S. H., Cho, H.
, 2018