RnDCircle Logo
arrow left icon

지능형 사업관리연구실

고려대학교 본교(제1캠퍼스) 건축사회환경공학부

조훈희 교수

Construction Automation

Dynamic Scheduling

BIM-Based Quantity Take-Off

발행물

전체 논문

106

21

ble-cage Hoist for High Operational Efficiency in Tall Building construction
Automation in Construction, 2018

22

Simulation Model for Productivity Analysis of External Insulated Precast Concrete Wall System
Baik, H., Kim, M., Lee, S. H., Cho, H.
Sustainability, 2018

23

Advanced planning model of formwork layout for productivity improvement in high-rise building construction
Lee, D., Lim, H., Kim, T., Cho, H., Kang, K. I.
Automation in Construction, 2018

24

The Accelerated Window Work Method Using Vertical Formwork for Tall Residential Building Construction
Kim, T., Lim, H., Kim, C. W., Lee, D., Cho, H., Kang, K. I.
Sustainability, 2018

25

Early-warning performance monitoring system (EPMS) using the business information of a project
Kim, C. W., Yoo, W. S., Lim, H., Yu, I., Cho, H., Kang, K. I.
International Journal of Project Management, 2018

26

Flexible double-cage hoist for high operational efficiency in tall building construction
Kim, T., Lee, U. K., Kim, S. W., Lim, H., Kim, C. W., Cho, H., Kang, K. I.
Automation in Construction, 2018

27

Optimized Growth Curve for Estimating Performance Measurement Baseline Depended on Domestic Construction Facility Type
CW Kim, T Kim, WS Yoo, H Cho, KI Kang
KSCE Journal of Civil Engineering, 2018

28

Simulation-based Planning Model for Table Formwork Operation in Tall Building Construction
Lim, H., Kim, T., Cho, H., Kang, K. I.
Journal of Asian Architecture and Building Engineering, 2017

29

Economic Analysis of USN-Based Data Acquisition Systems in Tall Building Construction
Lim, H., Lee, J. W., Kim, T., Cho, K., Cho, H.
Sustainability, 2017

30

Optimized growth curve for estimating performance measurement baseline depended on domestic construction facility type
Kim, C. W., Kim, T., Yoo, W. S., Cho, H., Kang, K. I.
KSCE Journal of Civil Engineering, 2017