발행물

전체 논문

131

51

Experimental investigation of precast concrete based dry mechanical column-column joints for precast concrete frames
홍원기, 허주연, 박선치
The Structural Design of Tall and Special Buildings, 201704

52

Experimental investigation of the influence of steel joints upon the flexural capacity of precast concrete columns
홍원기, 김지순, 김지훈
STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 201704

53

Losses of Prestressed Forces of Pre-Tensioned Precast Composite Beams
홍원기, 김지순, 임균택
STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 201704

54

Experimental investigation of slab joints between existing buildings and new frames for vertical expansion; [Part I]
홍원기, J.D. Nzabonimpa, 윤여진
STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 201703

55

DEVELOPMENT OF A STEEL-GUIDE CONNECTION METHOD FOR COMPOSITE PRECAST CONCRETE COMPONENTS
홍원기, 김선국, 김경주, 임채연
Journal of Civil Engineering and Management, 201701

56

Experimental investigation of dry mechanical beam-column joints for precast concrete based frames
홍원기, Nzabonimpa, 박선치
STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 201701

57

Automatic rebar estimation algorithms for integrated project delivery
홍원기, 임채연, 이동훈, 김선국
JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 201609

58

Analytical investigation of pre-stressed, pre-cast beams with steel pipe sleeves
STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 201601

59

Analytical investigation of hybrid composite precast beams with modified strain compatibility for entire history of nominal flexur capacity
홍원기, 이용제, 김선국, 김승일, 윤여진
STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 201509

60

A Dynamic Erection Simulation Model of Column-Beam Structures Using Composite Precast Concrete Components
홍원기, 김선국, 임채연, 이성호
JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 201508