프로젝트

완료된 프로젝트

119

11

F/S : (주) Hyundai NGV (Hyundai Mobis), Korea“Development of Overmodulation Method for Efficiency and Performance Optimization of Electric Vehicle Driving System”

1970년 - 1970년

12

F/S : (주) KEPCO, Korea“New Establishment of Transmission and Distribution Network Operation System”

1970년 - 1970년

13

F/S : (주) Hyosung Corp“Analysis of Effect of ESSs on Power Plant and Development of Its Detailed Model Based on Digslient Power Factory Software”

1970년 - 1970년

14

F/S : [Technical Consulting] (주) KEPCO-KEPRI, Korea“Energy Transition - CFI (Control, Flexibility, and Inertia) Expert Working Group”

1970년 - 1970년

15

F/S : (주) LG Electronics Inc., Korea“Development of Power Module Solution for 400 kW EV Fast Charger with High Efficiency and Small Size”

1970년 - 1970년

16

F/S : (주) ESP, Korea“Protection of Modular Green S/.S and Development of Monitoring Operation System for System Devices”

1970년 - 1970년

17

F/S : (주) KEPCO, Korea“[Consulting] Evaluation of Hosting Capacity of Renewables in Substation with 80 MVA Transformer”

1970년 - 1970년

18

F/S : (주) KEPCO, Korea[Cooperative Research Center] “PMU Date Based On-line Re-evaluation of Variable F/R Reserve and Development of Fast State Estimation Algorithm”

1970년 - 1970년

19

F/S : (주) KEPCO, Korea“A Study on the Compensation for Renewable Energy Curtailment”

1970년 - 1970년

20

F/S : (주) Hyosung Corp.“Development of ESS User-define Model with Smart Inverter Functions Based on Digslient Power Factory Software”

1970년 - 1970년