21
F/S : (주) Hyundai Heavy Industries Co. LTD., Korea“Development of Energy Management System of Electric Ship with Power Network Optimization and Load Forecasting Based on Navigation Data”
1970년 - 1970년
22
F/S : KETEP (에너지기술평가원), Korea“Development of Integrated PV/ESS System and Its EMS to Solve Capacity-Congestion of Distribution System of South Korea”
1970년 - 1970년
23
F/S : [Technical Consulting] KERI“Strategy to Improve Hosting Capacity of Variable Renewable Energy in Korea Power System on Energy Transition”
1970년 - 1970년
24
F/S : National Research Foundation (한국연구재단), Korea - National Research Lab. (국가지정연구실) - 중견자 전력(도약)연구사업 - 1, 2단계(5년) + 후속(3년)“A Study on Renewable Energy Based Integrated Optimal Operation and Analysis to Improve Reliability of Power System”
1970년 - 1970년
25
F/S : (주) KEPCO, Korea“Estimation of Renewable Energies Based DGs’ Capacity Permissible to a Practical Sub-station of South Korea”
1970년 - 1970년
26
F/S : (주) KEPCO, Korea“Grid-Code Development for DG Connection to 69 kV New Transmission System”
1970년 - 1970년
27
F/S : (주) Hanwha Techwin Inc., Korea“Development of Small-Size Inverter & Converter for Unmanned Search Vehicle”
1970년 - 1970년
28
F/S : (주) DIK, Korea[Industry Consulting] “Planning and Operation of Microgrid and its EMS”
1970년 - 1970년
29
F/S : (주) Mando, Korea“Improvement of Inverter Efficiency of 30% by New PWM Method Applied to IDB System”
1970년 - 1970년
30
F/S : (주) KEPCO-KEPRI via KESRI, Korea“Grid-Code Development of Distributed Generations in Stand-Alone Microgrid of Islanded Area”
1970년 - 1970년