프로젝트

완료된 프로젝트

119

21

F/S : (주) Hyundai Heavy Industries Co. LTD., Korea“Development of Energy Management System of Electric Ship with Power Network Optimization and Load Forecasting Based on Navigation Data”

1970년 - 1970년

22

F/S : KETEP (에너지기술평가원), Korea“Development of Integrated PV/ESS System and Its EMS to Solve Capacity-Congestion of Distribution System of South Korea”

1970년 - 1970년

23

F/S : [Technical Consulting] KERI“Strategy to Improve Hosting Capacity of Variable Renewable Energy in Korea Power System on Energy Transition”

1970년 - 1970년

24

F/S : National Research Foundation (한국연구재단), Korea - National Research Lab. (국가지정연구실) - 중견자 전력(도약)연구사업 - 1, 2단계(5년) + 후속(3년)“A Study on Renewable Energy Based Integrated Optimal Operation and Analysis to Improve Reliability of Power System”

1970년 - 1970년

25

F/S : (주) KEPCO, Korea“Estimation of Renewable Energies Based DGs’ Capacity Permissible to a Practical Sub-station of South Korea”

1970년 - 1970년

26

F/S : (주) KEPCO, Korea“Grid-Code Development for DG Connection to 69 kV New Transmission System”

1970년 - 1970년

27

F/S : (주) Hanwha Techwin Inc., Korea“Development of Small-Size Inverter & Converter for Unmanned Search Vehicle”

1970년 - 1970년

28

F/S : (주) DIK, Korea[Industry Consulting] “Planning and Operation of Microgrid and its EMS”

1970년 - 1970년

29

F/S : (주) Mando, Korea“Improvement of Inverter Efficiency of 30% by New PWM Method Applied to IDB System”

1970년 - 1970년

30

F/S : (주) KEPCO-KEPRI via KESRI, Korea“Grid-Code Development of Distributed Generations in Stand-Alone Microgrid of Islanded Area”

1970년 - 1970년