프로젝트

완료된 프로젝트

119

51

F/S : (주) KEPCO via KESRI , Korea“Improvement of Grid-Connection Profile due to Expansion of Distributed Generations”

1970년 - 1970년

52

F/S : (주) KEPCO, Korea“Development of Measurement-Based Dynamic Load Modeling”

1970년 - 1970년

53

F/S : National Research Foundation (한국연구재단), Korea“Study on Optimization for Bi-Directional Protection Coordination Based on Digital Protective Relay Applied to Multi-DGs”

1970년 - 1970년

54

F/S : BK21, Ministry of Education, Science and Technology (교육과학기술부), Korea“BK21 TMS Institute of Technology” in School of Electrical & Electronic Engineering, Yonsei Univ.

1970년 - 1970년

55

F/S : (주) E-Korea, Korea“Smart Grid Based Electric Machine Condition Monitoring System Development”

1970년 - 1970년

56

F/S : LS Industrial Systems (LS 산전), Korea“Development of 3 kW Grid-Connected PV Inverter & Battery Management System”

1970년 - 1970년

57

F/S : Korea Research Foundation (학술진흥재단), Korea“New Power Quality Index in a Distribution Power System Based on Real-Time Optimization Model”

1970년 - 1970년

58

F/S : Korea Power Exchange (전력거래소), Korea“Effect of Demand Response (DR) on Long-Term Load Forecasting”

1970년 - 1970년

59

F/S : Korea Power Exchange (전력거래소), Korea“Load Modeling Applied to Korea Power System”

1970년 - 1970년

60

F/S : POSCO (포스코), Korea“A Study on Distributed Generation Based Economic Dispatch, Power Quality, and Demand Response for Application to Energy Management System”

1970년 - 1970년